IMPACT PROGRAMME

Form IMPL 6A



WORKPACKAGE DESCRIPTION



Workpackage No: 9




Title: Controlling the reliability of the computer transcoding system


Duration: 3 months

Start month: 18 End month: 20



Initial state of work, preconditions for starting, & objectives:



The aims of this WP is to make sure that there are no inconsistencies between the DEI, WEKA and ARGE databases and the classification system.


An expert will be called upon to read the individual information items contained in each database (DEI, WEKA and ARGE) and checking that the BISNET code attributed automatically to the items actually matches the real code.

The activities carried out within this WP are necessary in order to make sure that the data are correctly classified and to inform the developers of the reclassification utility software of the problems that were encountered along the way.

Responsible for WP: DEI with the collaboration of the entire Consortium


Tasks:



9.1 Attributing BISNET codes to the DEI, WEKA and ARGE databases


9.2 Checking the codes to make sure they are properly matched

9.3 Report on the BISNET classification plan


9.4 Software implementation



Deliverables:




1. The result of the DEI, WEKA and ARGE databases coded with the BISNET codes

2. Prototype of the utility software for the transcoding of the databases

Details